You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Follow-up: cheap live MAX_STEPS=3 smoke on post-merge Track A SHA #84
Optional follow-up from Track A smoke on #83. Not a merge blocker — live MAX_STEPS=3 mid-run stop was already proved on 5830499 (Step budget exceeded (3/3)); suite 466/466 green on head.
Ask
Cheap live Haiku (or equivalent) harness smoke on the post-merge main SHA with OASIS_HARNESS=true, OASIS_HARNESS_MAX_STEPS=3, OASIS_HARNESS_HARD_STOP=true, confirm mid-run stop still fires and artifacts validate.
Done when
Live run stops with step budget exceeded at 3/3
Findings + coverage validators pass on produced artifacts
Note the SHA smoked in this issue
Close if we decide the pre-merge Research proof is enough and we do not want another paid run.
Activity
Track A: Eval Harness + Scoring Protocol (Findings, Budget, Coverage) (…